Description:
The Port of Port Angeles is soliciting sealed bids for the John Wayne Marina Harbormaster and Dockside Grill HVAC Upgrades. The bid date is scheduled for May 17, 2016 at 11:00 AM. All bids are to be received by the Port of Port Angeles 338 W. First Street Port Angeles, WA 98362 on or before this closing date and time. There is a pre bid walk-through scheduled for May 10, 2016 at 10:00am at the project location John Wayne Marina 2577 W. Sequim Bay Road Sequim, WA 98382. The pre bid walk-through is recommended but not mandatory. The project is for the furnish and install of two (2) complete ductless split heating and cooling system at the JWM (1) Harbormaster Office and (1) Dockside Grill. The Engineers estimate for the construction of this project is $20,000-$25,000. There is no bid bond required. Please contact Chris Rasmussen-Facilities Manager at 360-417-3446 or chrisr@portofpa.com. with questions and to receive bid documents.
Publication Date/Time:
4/26/2016 3:30 PM
Closing Date/Time:
5/17/2016 11:00 AM
Pre-bid Meeting:
May 10, 2016
Contact Person:
Facilities Manager – Chris Rasmussen
Business Hours:
8 AM to 5 PM