DOING BUSINESS

Bid Center

Administration Building 2nd Floor Heat Pump Replacement Project

Sep 5, 2017

Description:
The Port of Port Angeles is soliciting sealed bids for the Administration Building 2nd Floor Heat Pump Replacement Project. The bid date is scheduled for September 28, 2017 at 2:00 PM. All bids are to be received by the Port of Port Angeles 338 W. First Street, Port Angeles, WA 98362 on or before this closing date and time. There is a mandatory pre bid walkthrough scheduled for September 20, 2017 at 11:00am at the Port Administration Building 3rd Floor. Attendance at the pre-bid walkthrough is a requirement to bid on this project. The project is for the demolition of existing HVAC, furnish and install of new split system heat pump along with testing and balancing. The Engineers estimate for the construction of this project is $35,000. A 5% bid bond required. Plans and specifications can be obtained through http://www.BXWA.com. Questions can be directed to Chris Rasmussen 360-417-3446 or chrisr@portofpa.com.

Publication Date/Time:
9/5/2017 2:00 PM

Closing Date/Time:
9/28/2017 2:00 PM

Pre-bid Meeting:
09/20/17 at 11:00 AM

Contact Person:
Chris Rasmussen
360-417-3446 or chrisr@portofpa.com

Plan & Spec Available:
http://www.BXWA.com

Business Hours:
8 AM to 5 PM