News Flash

Home

Posted on: August 7, 2018

Port Awarded CERB Funds for Wash-Down Facility

MITP rendering 8-6-18 news flash

In late July, the Port of Port Angeles was notified that the Community Economic Revitalization Board (CERB) approved a $1,105,000 loan at 2% and a $195,000 grant for a total of $1.3 million of funding for their wash-down facility, the cornerstone to the Marine Trades Industrial Park (MTIP). 


As part of the MTIP’s phase 1 of development, the wash-down facility will be an 18,500 square foot concrete pad equipped to wash down large vessels being taken out of the water via a travel lift on the Port’s travel lift pier.  The wash-down facility will accommodate vessels up to 50 meters (164 feet) in length.  An on-site wastewater treatment facility will be constructed in 2019.  The wastewater from the wash-down facility in the meantime will be trucked to the Port’s wastewater facility located in the Port Angeles Boat Yard.


Port tenants such as Westport Shipyard and Platypus Marine will be initial users of the facility plus the future tenants of the MTIP.  Washing down vessels prior to any vessel repairs and painting is essential.  The Port and waterfront businesses do not currently have a facility of this size that can accomplish this type of work.  Construction of the facility is currently underway and will be completed in late fall 2018. 


The wash-down facility will be constructed in the most northwest corner of the MTIP (depicted above) located at the environmentally cleaned-up former plywood mill site.  The Port has identified boat building and repair as an economic development niche which has potential to increase local jobs by up to 250, support commercial and recreational boaters and generate lease revenues for the cleaned-up former mill site. Through various stakeholder meetings, wash-down facility site visits and research, the Port staff and commission decided a wash-down facility was a ‘must have’ for the MTIP.  


Port staff and commissioners were thrilled with the CERB funding award.  “I'm looking forward to this new asset serving current and future customers and being the first cornerstone in our Marine Trades Industrial Park,” stated Commission President, Connie Beauvais.


For further information, please contact:

Chris Hartman at (360) 417-3422

Director of Engineering

Port of Port Angeles

Additional MTIP Info...
Facebook Twitter Email

Other News in Home

Port Logo Newsflash

April 2019 Port Pilot Released

Posted on: April 14, 2019
JWM aerial news flash photo

John Wayne Marina Final RFI Released

Posted on: March 22, 2019
Port Logo Newsflash

March 2019 Port Pilot Released

Posted on: March 5, 2019
Port Logo Newsflash

Port Declares Emergency Situation

Posted on: December 21, 2018
Laundry news flash 10-25-18

Boat Haven Laundry Facility Set to Open

Posted on: October 24, 2018
CERB-Logo-with-transparent-background news flash

Notice of CERB Funding Application

Posted on: October 10, 2018
Admin front entrance construction news flash

Admin Entrance Construction

Posted on: October 2, 2018
CERB-Logo-with-transparent-background news flash

Notice of CERB Grant Application

Posted on: September 6, 2018
Elevator closed picture 8-21-18

Elevator Closed for Upgrades

Posted on: August 21, 2018
JWM aerial news flash photo

2018 JWM Waterfront Day

Posted on: August 3, 2018
CERB-Logo-with-transparent-background news flash

Notice of CERB Funding Application

Posted on: May 15, 2018
Gussman Panorama of PABH 2017 news flash

Power Outage on PABH Floats

Posted on: December 6, 2017